Our Work

F2E Highway NSW

Project Brief:
The Frederickton to Eungai Highway project incorporated the construction of a 26 km long section on the Pacific Highway, which is inclusive of 13 mainline bridges and overbridges.

The project aimed at the expansion of the Pacific Highway located in NSW, Australia.

Source: Pacific Highway

Our Role:
Concrete Reinforcement Services was a subcontractor in this project, and was engaged to utilize its expertise in Steel fixing for reinforced concrete throughout the construction process of the F2E Highway.

Our Role:

We were engaged in this project as a subcontractor, to carry out steel fixing for reinforced concrete. Our team worked tirelessly to get the job done and carried out steel fixing on the site in an efficient manner; to position reinforcing bar and steel mesh into reinforced and concrete pours to provide them with enhanced strength and longevity.

Ballarat Wastewater Treatment Plant VIC

Project Brief:

This project aimed at the up-gradation of the Ballarat Wastewater treatment plant located in Ballarat, in the state of Victoria. The upgrade was done to provide better wastewater treatment services to the residents of Ballarat.

Clem7 Tunnel QLD

Project Brief:

The development of the twin tunnel, or the North-South Bypass Tunnel aimed at enhancing the Brisbane city and suburban areas’ road network.

Source: ATS

Our Role:

CRS was a part of this project where we catered to steel fixing and provided high-quality reinforcement services. We conducted the efficient installation of the best quality steel for this project.

Our Role:

This project required a great deal of concrete works, and so the experts at CRS were engaged to do the job effectively. Our team of professionals conducted steel fixing for this development project.

Source: Oz Roads

Eastern Distributor NSW

Project Brief:

A 6 km motorway that has a significant role in making the motorway network of Sydney efficient, was constructed featuring a double-deck tunnel of 1.7 km to help the drivers save time while on the road.

Cross City Tunnel NSW

Project Brief:

This project involved construction of a 2.1 km long twin road tunnel, linking Darling Harbour to Rushcutters Bay in the CBD and Eastern suburbs respectively. The Cross City tunnel comprises two tunnels under the Bathurst Streets, and William Street to cater to the routes towards the west and the east.

Source: Crude Oil Peak

Our Role:

Concrete Reinforcement Services has been servicing clients nationally, and this was another feather in our hat. We worked as subcontractors and carried out the steel fixing within the scope of this project.